| Operating Data |
|
|
| |
Before the Turbine
Installation |
After the Turbine
Installation |
| Boiler Steam Generation |
6 TPH @ 10 bar Dry Saturated |
6 TPH @ 32 bar 320oC |
| Boiler Fuel |
Biomass |
Biomass
|
| Grid Power Consumption |
350 kWh |
25 kWh |
| Turbine Power Generation |
0 kWh |
325 kWh |
| Total Power Consumption |
350 kWh |
350 kWh |
| Cost of Power from Grid |
Rs. 5.50 / kWh | 0.125 $/kWh |
Rs. 5.50 / kWh| 0.125 $/kWh |
| Operation days per annum |
300 days |
300 days |
| Cost of Power Drawn per annum |
Rs. 138.60 Lakhs | 315,000 $ |
Rs. 9.90 Lakhs | 22,500 $ |
| Gross Savings Per annum |
Rs. 128.70 Lakhs | 292,500 $ |
| No of Turbine Operators |
Nil (virtually unmanned operation) |
| Maintenance Cost per Annum |
Rs. 2.25 Lakhs | 5,113 $ |
| Cost of Additional Fuel for Power Generation |
Rs. 29.72 Lakhs | 67,546 $ |
| Total Operation & Maintenance |
Rs. 31.97 | 72,659 $ |
| Net Savings per Annum |
Rs. 96.73 Lakhs | 219,841 $
|
| % Power Cost Saving |
|